COMPLETED PROJECTS
Special Works
SPECIAL WORKS
2019- – CONSTRUCTION OF ANCHORS FOR SUPPORT AND DRAINAGE OF EXCAVATIONS – LOS LAGOS HYDROELECTRIC PLANT (Río Bueno). BOV Consortium.
2016 – REPLACEMENT OF SEISMIC ISOLATORS AT THE FALABELLA DATA CENTER. South American Construction Company. Existing Building Excavation for Seismic Isolator Replacement and Subsequent Installation. Calculations: Hoehmann Stagno y Asociados – Postec.
2015 – POST-TENSIONED BEAMS, LOS LIBERTADORES STATION ROOF – METRO LINE 3. Besalco-Dragados Consortium. Alternative project of 3 Post-Tensioned Beams with Shear and Torsion design. Calculation: Worley Parsons – Arcadis Consortium.
2015 – ANCHORAGES FOR THE LAS DAMAS GAS PIPELINE BRIDGE FOUNDATIONS. Gas Andes. Permanent Post-Tensioned Anchors for Foundations. Calculation: Arcadis – Postec.
2015 – DESIGN AND EXECUTION OF POST-TENSIONED ANCHORS FOR WIND TURBINE FOUNDATIONS AT CERRO BAYO MINE (Chile Chico). Seawind. Permanent Post-Tensioned Anchors for Foundations. Calculation: Postec.
2011 – BRIDGE CONSTRUCTION TO AIRPORT ACCESS AMB. Costanera Norte Concessionaire – Gesvial. Construction of 4 bridge sections, 1.80 m high, weight of each section: 700 tons.
2011 – SURVEY, ENGINEERING AND REPAIR OF THE ROUTE 68 BRIDGE. Costanera Norte Concessionaire – Gesvial.
2011 – LIFTING AND RIPPING OF THE INDEPENDENCIA OVERPASS DECK. Dycasa – Américo Vespucio Express.
2011 – ENGINEERING AND EXECUTION OF NEOPRENE REPLACEMENT ON THE DEPARTMENTAL OVERPASS, AMÉRICO VESPUCIO SUR CONCESSIONAIRE. Gesvial – Costanera Norte.
2011 – ENGINEERING CONSULTING FOR PREFABRICATED AND POST-TENSIONED ELEMENTS FOR MINERA LOBO-MARTE. Calculation: SNC Lavalín.